Title |
Development of Design Support System to Optimize the Temporary Work |
Authors |
Cho, Hun-Hee ; Park Jae-Woo ; Kim, Jung-Yeol ; Cho, Moon-Young |
Keywords |
Temporary work ; Temporary bent ; Selection of crane ; Design optimization ; Information management |
Abstract |
Design of steel bridge°Æs temporary works has conducted relying on the experiences of engineers based on the previoussimilar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actualconstruction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developedan optimum design support system for temporary works of the steel bridge construction through establishing the database for thematerials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the worksthrough the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the designinformations at the construction stage. |