Title |
Analysis of Main Control Factors for Design Value Engineering Work in Construction Projects |
Authors |
Kim, Soo-Yong ; Yang, Jin Kook |
Keywords |
Design Value Engineering ; Issue Cause ; Case Study ; Survey ; Main Control Factors |
Abstract |
Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effectiveaccomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient inact of research. Therefore in this research we have suggest the standard for the effective accomplishment of design valueengineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professionalinstruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering workthrough research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineeringwork and the following scheme and process of work efficiency optimization. |