Title |
Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage |
Authors |
Kim, Hae-Gon ; Park, Sung-Chul ; Koo, Kyo-Jin ; Hong, Tae-Hoon ; Hyun, Chang-Taek |
Keywords |
Design Development ; Interior Construction ; Schematic Estimating ; Element Breakdown Structure |
Abstract |
For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model |