Title |
Development of the Work Information Management System of Pavement Crack Sealing |
Authors |
Byun, Woong-Ho ; Oh, Se-Wook ; Lee, Hyun-Jung ; Kim, Young-Suk |
Keywords |
Crack Cealing ; PDA ; Web-based ; Work Information ; Measure Performance |
Abstract |
Crack in Pavements have been continually increased aby water penetration Therefore, the cracks can result in deterioration of the pavements that could be extremely dangerous fro road users. Creak sealing work performed in outdoor is very dangerous, costly and labor intensive. To slove these problems, automated crack sealing systems have been developed. it Would be needed that work information related to crack sealing must be gathered in an effort to used for existing or future crack sealing work. Furthermore, work information related to crack sealing could be utilized in analyzing work productivity and condition. The primary objective of this study is to propose a PDA and Web-based system for work information management of crack sealing which enables to effectively interchange work information between head office and fields, and to accurately collect work information. Finally, it is anticipated that the effective use of the developed PDA and web-based system would be able to effectively share work information, measure productivity, estimate costs as well as plan future work schedule. |