Title |
An Analysis on affecting factors about lowly using 3D CAD by using the AHP |
Authors |
Lee, Sang-Hyo ; Ahn, Byung-Ju ; Kim, Ju-Hyung ; Kim, Kyung-Hwan ; Lee, Yoon-Sun ; Kim, Jae-Jun |
Keywords |
3D CAD ; AHP(Analytic Hierarchy Process) ; Affecting facto |
Abstract |
Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(InformationTechnology and Information System) of the construction is recently suggested with the alternative proposal. So not only is astudy progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure ofthe construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work andincludes the object information which can use with the base of the information database of the construction, it has the high valuenot only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggishin the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC(Architect-Engineer-Contract),the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution ofthe Affecting factors about lowly using 3D CAD |