Title |
A Decision-Making Model for Shortening Construction Period through Concurrent Engineering |
Authors |
Choi, Do-Seung ; Lee, Jae-Seob |
Keywords |
Concurrent Enigneering ; Simulation ; Overlap ; Sensitivity ; Production |
Abstract |
The age of synthetic correspondence against “development period shortening, high quality” is about to come. While theproduct is becoming complexation gradually and also diversification, life cycle of product gets shorted. Under the infinity competition age, the certain answer of “the survival of the fittest” is that the enterprise itself must be ableto shorten development and delivery term, reduce product development and life cycle cost, and satisfy customer inperformance and value. From this point of view, concurrent engineering’s theory, which develops the process of product in the manner of repetition,parallel, and synchronousness, is realized as a important strategy instrument in construction. This study investigates and analyzes several examples in order to apply concurrent engineering successfully, and presents thedecision-making model through the simulation about the factor affecting in each process. |