Title |
An RFID and BIM based Simulator for Construction Material Logistics and Progress Management |
Authors |
Yoon, Su-Won ; Chin, Sangyoon |
Keywords |
Radio Frequency Identification ; 4D ; 4D Simulator ; Logistics ; Progress Management ; BIM based Construction Management |
Abstract |
There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based real-time simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design BIM data to construction BIM data. |