Title |
Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project |
Authors |
Chae, Yeong-Seok ; Park, Seo-Young ; Moon, Hyoun-Seok ; Kim, Seon-Yeong ; Kang, Leen-Seok |
Keywords |
CM Delivery Business Breakdown Structure ; CM Delivery Business Process Model ; CM Delivery Support System |
Abstract |
Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced the CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. Besides, this study configured a business breakdown structure for the CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery. |