Title |
Proper Estimating Method for Environmental Preservation Cost in Road Projects |
Authors |
Park, Ji-Sun ; Lee, Sea-Hyun |
DOI |
http://dx.doi.org/10.6106/KJCEM.2012.13.2.003 |
Keywords |
Road Projects ; Environmental Preservation Cost ; Anti-Pollution Facilities |
Abstract |
The current enforcement regulation of「 Construction Technology Management Act」prescribes calculation standard of environmental preservation cost in construction site. According to this standard, environmental preservation cost is calculated by using the quantity-per-unit costing method or applied fixed rate on direct cost. However, when calculated by using the quantity-per-unit costing method it is few items to put in the budget according to standard of construction estimate and in the case of using the fixed rate on direct cost it is not considering various characteristics of the construction site. Therefore, it is needed a improvement plan of estimating method and management system for environmental preservation cost. In this study, it surveyed the actual state of the environmental preservation cost according to magnitude of project, site location, anti-pollution facilities and etc. over 38 road projects. The research reported in this paper environmental preservation cost was variously distributed over construction sites. Thus it needs to estimating method and management system to consider characteristics of construction site for environmental preservation cost. |