Title |
Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- |
Authors |
Kim, Hyeon-Seung ; Moon, Hyoun-Seok ; Choi, Gwang-Yeol ; Kim, Chang-Hak ; Kang, Leen-Seok |
DOI |
http://dx.doi.org/10.6106/KJCEM.2012.13.2.011 |
Keywords |
Civil engineering project ; Risk Management ; Project Life-cycle ; Workspace conflict |
Abstract |
Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects. |