Title |
Analysis and Quantitative Estimation of Risk Factors of Design-Build |
Authors |
Oh, Guk-Yeol ; Lee, Young-Dai |
DOI |
http://dx.doi.org/10.6106/KJCEM.2012.13.5.012 |
Keywords |
design build ; risk factors ; risk response ; factor analysis ; contingency |
Abstract |
The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects. |