Efficient Application of Multi-Trade Contract Method to Public Construction Project |
DOI |
http://dx.doi.org/10.6106/KJCEM.2013.14.2.035 |
Keywords |
Public Construction Project ; Multi-Trade Contract Method ; Project Delivery Method |
Abstract |
Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner’s role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner’s management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner’s organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades. |