Title |
Usability Improvement of BIM for Construction Projects Using Active BIM Functions |
Authors |
Kang, Leen-Seok ; Moon, Hyun-Seok ; Kim, Hyeon-Seung ; Kwak, Joong-Min |
DOI |
http://dx.doi.org/10.6106/KJCEM.2013.14.5.074 |
Keywords |
Active BIM ; Passive BIM ; 4D CAD System ; Genetic Algorithm ; Optimized Schedule |
Abstract |
Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions. |