Title |
An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - |
Authors |
Lee, Eun-Young ; Kim, Yea-Sang |
DOI |
http://dx.doi.org/10.6106/KJCEM.2014.15.3.038 |
Keywords |
Free Form Building ; Construction Productivity ; Productivity Hindrance Factor ; Exposed Concrete |
Abstract |
The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity. |