Title |
Work Process Analysis of the High-performed Precast Concrete Columns using Simulation Technology |
Authors |
Shin, Young-Su ; Cho, Kyuman ; Cho, Chang-Geun |
DOI |
http://dx.doi.org/10.6106/KJCEM.2014.15.4.049 |
Keywords |
HPFC concrete columns ; Work process ; Discrete event simulation techniques |
Abstract |
Since the structure systems of construction projects have been forced to be large, high-rised, and complex, many researchers have been put their efforts to develop high strength concrete incorporating diverse advanced materials. In order to improve the performance of the concrete, the fibers leading high ductility to concrete have been used, consequently concrete columns adopting High-Performance Fiber Cement(HPFC) have been developed. This paper analyzed not only the construction work process of HPFC column installed to the real construction project, but also construction productivity of the columns by using discrete event simulation technique. As a result, several considerations on installing such a column have identified, compared with the works for typical concrete columns. In particular, there was specific characteristic to install the columns in terms of labor resource productivity, which is not shown with the work for the typical concrete columns. |