Title |
A Comparative Analysis of Hindrance Factors to Labor Productivtiy in Each Construction Site Using the IPA |
Authors |
Jeong, Jae-ho ; Lee, Suk-Won ; Ahn, Byung-Ju ; Jee, Nam-Yong ; Kim, Jae-Jun |
DOI |
http://dx.doi.org/10.6106/KJCEM.2014.15.6.071 |
Keywords |
Labor productivity ; Construction site ; IPA |
Abstract |
Korea's labor productivity in construction sites is dependent on experience and act in accordance with the human element of the construction workers. In order to increase the work productivity of the construction site that requires a strategic management to potentially hindrance factors of labor productivity. However, without considering the potential problems, management of labor productivity in prior studies is focused only on the immediate problems. The purpose of this study is to compare the site-specific analysis of labor productivity impediments using easy IPA to identify potential causes. As a result of the analysis was to identify the realistic problems of job insecurity and poor working conditions as well as economic problems. It is expected that it is possible to provide the basic data to strategy suggestions for long-term labor productivity improvement of the construction site. |