Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario |
Authors |
Lee, Sihyun ; Lee, Seounghyun ; Son, Jaeho |
DOI |
http://dx.doi.org/10.6106/KJCEM.2016.17.3.043 |
Keywords |
TCTO ; Optimization ; Emergency Construction Work ; Genetic Algorithm |
Abstract |
Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile. |