Title |
Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects |
Authors |
Yoo, Seungeun ; Kim, Taewan ; Yu, Jungho |
DOI |
http://dx.doi.org/10.6106/KJCEM.2017.18.1.003 |
Keywords |
IPD(Integrated Project Delivery) ; Project Delivery System ; Project Performance ; Case Study |
Abstract |
Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in th |