Title |
Empirical Study for the Appraisal System of Execution Capacity using Correlation Analysis |
DOI |
http://dx.doi.org/10.6106/KJCEM.2018.19.2.003 |
Keywords |
Appraisal ; Public Announcement ; Execution Capacity ; Earned Value ; Correlation |
Abstract |
The system to appraise the execution capabilities of constructoin companies had been began as the Construction Contract Restriction System in 1958, was changed as the Construction Subcontract Restriction System in 1961, and finally has been operated as the Appraisal and Public Announcement of Execution Capacity (APAEC) from 1996. The APAEC system has been utilized as a firm and unique tool for assessing the execution capacities of construction companies despite many problems and continuous system changes. In spite of numerous studies to improve the APAEC system, however, efforts to analyze the system from the empirical point of view were insufficient. In this study, we analyze the status of APAEC system through analyzing correlations among assessment results of the APAEC, earned values of construction works, construction management performance indexes, and macroeconomic indexes for the past 10 years from 2007 to 2016. As a result of the analysis, it was found that Appraisal Value of Execution Capacity (AVEC) is excessively inflated in engineering and landscaping areas compared to Earned Value of Construction Work (EVCW) and the correlations between the AVECs and EVECs are not high in the areas of engineering, industrial equipment, and landscaping. In addition, technical appraisal values are excessively inflated in engineering and landscaping areas and correlations between AVEC and its components are high in the areas of engineering & building, industrial equipment, and large companies, but low in the areas of engineering, building, landscaping, and small and medium companies. Finally, the concentration of the AVEC is intensifying more and more and the concentration deteriorates construction management performance indexes and macroeconomic indexes. If we continuously improve the APAEC system based on the implications derived in this study, the APAEC system will be able to maintain it's position of a firm and unique means to access the execution capacities of construction companies. |