Title |
Success Factors of Scheduling in Small-Scale Building Construction with Owner-CM Delivery Method |
Authors |
Kim, Seon-Gyoo ; Kim, Junyoung |
DOI |
http://dx.doi.org/10.6106/KJCEM.2019.20.1.096 |
Keywords |
Small-Scale Building ; Owner-CM ; Scheduling ; BDM ; Beeliner |
Abstract |
Recently, projects are being actively promoted to develop a new residential district centered around the metropolitan area, or to redevelop the residential area that was established long ago as unplanned land development. In this residential area, the owner can directly construct the building, and the way the building owner builds the residential house is called the direct construction of the owner. If the owner has the construction management (CM) capability while conducting direct management of the owner, the direct construction can be carried out by the CM method. This type of construction is called Owner-CM delivery method. However, it is very rare for small-scale construction in Korea to be implemented by the Owner-CM method. This may be due to the lack of knowledge and experience about the CM of the owner. In this study, we investigated the actual cases of the scheduling for the residential houses of similar size which were built at the same time in the residential housing complex developed near the metropolitan area. The purpose of this study is to derive the success factors of the scheduling in the small-scale construction from the cases carried out by the Owner-CM method. These success factors of the scheduling can be used as meaningful reference for the owners who want to build their own house in the future. |