Title |
Improvement of CM Fee Estimation Criteria for Efficient CM Service |
Authors |
Cho, Youngjun ; Sung, Youngmo |
DOI |
http://dx.doi.org/10.6106/KJCEM.2019.20.2.105 |
Keywords |
CM Service ; Fee Estimation ; Labor Standards Law ; Construction Technology Promotion Act |
Abstract |
As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours. |