Title |
A Study on the Factors for Strengthening Competitiveness of CM Projects based on Balanced Score Card |
Authors |
Nak Kyu Beak ; Dong Heon Lee ; Hyoung Chul Lim |
DOI |
http://dx.doi.org/10.6106/KJCEM.2019.20.6.074 |
Keywords |
BSC; CM; Project; Competitiveness; Competence Factor |
Abstract |
In domestic construction industry, CM companies perform overall project management tasks such as planning, designing, construction management, evaluation, maintenance for construction projects. However, even with these tasks, as competition becomes more fierce and probability dependence is high, lots of CM companies are experiencing difficulties of securing and preparing indicators for order competence reinforcement. This study examines domestic business condition and task analysis. Also Competence factors are derived through institutional and legal investigation, and review of existing literature. The derived competence factors are focused on practical factors by interviewing with experts. competence factors for each type were classified into BSC's four perspectives(Finance / Customers / Internal processes / Learning and Growth) and surveyed. Based on the results of the survey, the priorities of competence factors that companies should focus on were derived. The purpose of this study is to contribute on making an indicator that can be utilized on business activities through priority analysis of competence factors for order competitiveness reinforcement of CM companies. |