Title |
Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok |
Authors |
Kang, Seunghee ; Jung, Youngsoo |
DOI |
http://dx.doi.org/10.6106/KJCEM.2020.21.3.048 |
Keywords |
Preliminary Construction Cost; Wood Work Quantity; Unit Cost Model; Modernized Hanok; Module; Planning Stage |
Abstract |
Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage. |