Title |
Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector |
Authors |
Park, Bo-sung ; Kim, Ok-kyue |
DOI |
https://dx.doi.org/10.6106/KJCEM.2021.22.2.097 |
Keywords |
CM at Risk; Public Secter; Pilot Project; Pre-Construction Service |
Abstract |
The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future. |