Title |
Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects |
Authors |
Lee, Jong-Tae ; Yun, Hyun-Do |
DOI |
https://dx.doi.org/10.6106/KJCEM.2021.22.3.012 |
Keywords |
Public Construction Work; Appropriate Construction Period; Quality; Safety |
Abstract |
In order to secure construction quality and safety and prevent cost disputes, the importance of calculating ‘the appropriate construction period’ has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active ‘transformation of thoughts’ was proposed through this study. In other words, the process of reviewing and calculating ‘the appropriate construction period’ was institutionalized by introducing ‘process management experts’ and ‘construction experts by type of construction’ in the design stage. |