Title Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support -
Authors Jang, Ji young ; Lee, Ji yeon ; Kim, Ha yoon ; Lee Jun ho ; Kim, Jun-Sang ; Kim, Jung-Yeol ; Kim, Young Suk
DOI https://dx.doi.org/10.6106/KJCEM.2022.23.5.043
Page pp.43-55
ISSN 2005-6095
Keywords Assembled Temporary Equipment; Quality Evaluation; Quality Management
Abstract Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.