Title |
Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data |
Authors |
Mun, Junbu ; Yun, Sungmin |
DOI |
https://dx.doi.org/10.6106/KJCEM.2023.24.1.003 |
Keywords |
Post Evaluation System; Performance Evaluation; Project Planning; Preliminary Feasibility Study |
Abstract |
According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phasebased performance evaluation from planning phase to construction phase. |