Abstract |
This research examines the need for a quantitative and objective method of calculating baseline productivity in the construction industry, which is known for its high volatility in performance and productivity. The existing literature's baseline productivity calculation methods rely heavily on subjective criteria, limiting their effectiveness. Additionally, data collection methods such as the "Five-minute Rating" are costly and time-consuming, making it challenging to collect detailed data at construction sites. To address these issues, this study proposes an objective baseline calculation method using unimpacted productivity BP, a work check sheet to systematically record detailed data, and a data collection and utilization process that minimizes cost and time requirements. This paper also suggests using unimpacted productivity BP and comparative analysis to address the objectivity and reliability issues of existing baseline productivity calculation methods. |