Delivery guideline composition and utilization plan for 4D CAD-based schedule management |
Authors |
Kang, HyoJeong ; Kang, Leenseok |
DOI |
https://dx.doi.org/10.6106/KJCEM.2024.25.5.003 |
Keywords |
Schedule Management; BIM; Deliverable; Delivery Guidelines |
Abstract |
Recently, both nationally and internationally, various BIM guidelines have been developed. These guidelines present fundamental principles and standards for the application of BIM. However, practical BIM guidelines for the schedule management area in the construction phase are lacking, making it difficult to apply them effectively in practical work settings. In this study, performance-based delivery guidelines are presented for the key functionalities of 4D CAD systems, which are representative BIM tools used in the construction phase. To achieve this, a survey analysis was conducted to determine the prioritization of these functionalities. Based on the characteristics of the project, delivery guidelines were formulated to allow users to selectively utilize the guidelines at different levels. Furthermore, practical ways to utilize performance-based delivery guidelines for schedule management using 4D CAD were proposed, validating the usability of these guidelines. The research findings suggest that these guidelines for BIM functionality in schedule management can hold practical significance as the utilization of BIM in construction phases continues to increase. |